Screen Reader Access      Text Size    +  A    

Tender

Total Tenders : 29603 , Corrigendum : 2712
Total Archive Tenders : 187 , Corrigendum : 51
Sl No Tender No Publishing Date Inviting Authority Brief Description of Work
21 NIT: WBPWD/EE/DED/e-NIQ-02 of 2017-18
Download
28/04/2017 E.E., P.W.D, DARJEELING ELECTRICAL DIVISION Supply installation testing and commissioning of four panel HT VCB at new sub-station of NBMC&H. and allied work.
22 NIT: 02/T/JED of 2017-18
Download
28/04/2017 E.E.,P.W.D JALPAIGURI ELECTRICAL DIVISION Supply and installation split type A.C Machine at different Hospital under CMOH Jalpaiguri
23 NIT: 01e/T/JED of 2017-18
Download
28/04/2017 E.E.,P.W.D JALPAIGURI ELECTRICAL DIVISION Repair and renovation to the chamber of D.M., Jalpaiguri along with video Conference room and Conference Hall at District Collectorate Building Jalpaiguri E.I. Work.
24 NIT: 03 of 2017-2018
Download
28/04/2017 E.E, Kolkata North Division, P.W.D Special roof treatment work with APP modified water proofing membrane over the roof of existing 3 storied building (G -Type) Situated at the Central Diary Campus 64/99 Belgachia Road Kolkata 700037 during the year of 2017-18
25 NIT: 2 of 2017-18 of AE (PWD) Darjeeling Raj Bhawan Sub-Division.
Download
27/04/2017 A.E., P.W.D. Darjeeling Raj Bhavan Sub-Division Repair of Equipment Room of BSNL at Ground Floor of Doctor quarter and allied works at Darjeeling Raj Bhavan under S.G.E/ W.B during the year of 2017-18
26 NIQ: 08 /Q of 2016-17
Download
27/04/2017 S.E.Central Electrical Circle P.W.D. Annual comprehensive maintenance of Window/Split AC Machine of 1.5TR/ 2TR capacity at Matri Sadan & Sadar Hospital , Berhampore, Murshidabad for 12(Twelve) month
27 NIT: WBPWD/KWD/EE/ NIT-03/2017-2018
Download
27/04/2017 E.E.,KOLKATA WEST DIVISION, P.W.D Renovation and Modification of the office room of The Principal Secretary, Tourism Department at 3rd floor, A Block of N.S. Building during 2017-18
28 NIT: 01 of 2017-2018 of E.E./P.W.D./N.B.C.D.
Download
27/04/2017 E.E., (P.W.D) North Bengal Construction Division Providing surfacing to Naxalbari- Kharibari road from 12.40 km to 15.00 km in the district of Darjeeling under Siliguri Construction Sub Division No.I under North Bengal Construction Division, PWD, Siliguri during the year 2017-2018
29 NIT: 2 of 2017-2018 of Assistant Engineer P.W.D. Chetla Sub-Division
Download
27/04/2017 A.E., (PWD) Chetla Sub-Division Development of common passage & new water connection of Newly constructed caretaking staff Quarter within the compound of Bhabani Bhaban during the year 2016-2017 (R&B) & (S&P).
30 NIT: WBPWD/SENABC/NIeT-04/2017-18
Download
27/04/2017 S.E.,NABANNA CIRCLE PUBLIC WORKS DIRECTORATE Construction of approach road to the newly constructed PVD building at Behala including extension of entrance gate and construction of perimeter wall during the year 2016-17 (Total length 300Mtr)
31 NIT: 01 / SNP / KSHD of 2017 - 2018
Download
27/04/2017 E.E-I (PWD),KOLKATA SOUTH HEALTH DIVISION, (Erstwhile SUBURBAN DIVISION) Construction of Underground Surface Drain in place of Open Surface Drain within the compound of Chittaranjan Seva Sadan and Sishu Sadan during the year 2017-2018.
32 NIQ: WBPWD / SEHEC / NKHED / NIQ04 / 17-18
Download
27/04/2017 S.E.,(P.W.D)Health Electrical Circle Restructuring and renovation of the rooms at Orthopedic OPD complex at CB building at KMCH, Kolkata ------- Air conditioning system.
33 NIT: 02/AE/NKHSD-I of 2017-2018
Download
27/04/2017 A.E.,NORTH KOLKATA HEALTH SUB-DIVISION NO.-I,PWD Urgent repair work to the pump allied pipe line valve related to the feeder line along with some other replacement and restoration work to the overhead tank portion inside the campus of ID & BG Hospital 57 Beliaghata Main Road Kolkata 10 during the year 2017-2018
34 NIQ: 09 /Q of 2017-18
Download
27/04/2017 S.E.Central Electrical Circle P.W.D. Electrical Installation work of OPD Ticket Counter at Murshidabad Medical College & Hospital - SITC of CCTV Surveilance
35 NIQ: 10 /Q of 2017-18
Download
27/04/2017 S.E.Central Electrical Circle P.W.D. Electrical Installation work of OPD Ticket Counter at Murshidabad Medical College & Hospital - SITC of LAN System
36 NIQ: 11 /Q of 2017-18
Download
27/04/2017 S.E.Central Electrical Circle P.W.D. Electrical Installation work of OPD Ticket Counter at Murshidabad Medical College & Hospital - SITC of Fire detection System
37 NIQ: 12 /Q of 2017-18
Download
27/04/2017 S.E.Central Electrical Circle P.W.D. Electrical Installation work of OPD Ticket Counter at Murshidabad Medical College & Hospital - SITC of EPABX System
38 NIT: 04 / KSHD of 2017 - 2018
Download
27/04/2017 E.E.,P.W.Dte. KOLKATA SOUTH HEALTH DIVISION, (Erstwhile SUBURBAN DIVISION) Redistribution of Water Supply Pipe Line for Main Building including KMC water supply for MO Quarter at Block-A of Vidyasagar S. G. Hospital, Behala, Kolkata-34 during the year 201-2018 (Bldg. and S&P Works)
39 NIT: 07 OF 2017-2018
Download
27/04/2017 E.E.-I,KOLKATA CENTRAL HEALTH DIVISION (Erstwhile kolkata Division) Repair & Renovation of Bathroom block in NHQ building (west side) from ground floor to 4th floor within the compound of NRSMC & H during the year 2017-2018
40 NIQ: WBPWD/EE-KED/NIQ-07/2017-18
Download
27/04/2017 E.E., PWD Kolkata Electrical Division Annual Maintenance of 2 Nos. (2 X 4.25 TR) capacity Compressor ductable type Air-Conditioning system installed at I.T. Division (Battery Bank Room) - Ground Floor, Main Block of Writers Building under Writers Building Electrical Sub-Division, P.W.D. (for 12 months)
 Prev 1 2 3 4 Next  Last

Log In

 







Mamata Banerjee

Hon'ble Chief Minister